Public Environmental Review

In accordance with the Environmental Protection Act 1986, Karara Mining Limited, a joint venture company of Gindalbie Metals Limited and Ashan Iron and Steel Group Corporation, has prepared a Public Environmental Review (PER) that describes the Karara Iron Ore Project and its likely effects on the environment.  The PER can be downloaded from this web page.In some instances the quality of the files linked below has been reduced to allow them to be downloaded from this website.  All files in their original quality are available for purchase for $5on a CD. Printed copies of the PER Main Report (Volume 1), including a CD with Volumes 2-6 of supplementary information are also available for purchase for $10.  To obtain either a CD or printed copyof the PER please contact:

Diana Della Penna
Karara Mining Ltd
Level 8, London House216 St Georges Terrace
Perth WA
Phone: (08) 6298 1014   Fax: (08) 9480 8799
Email: diana.della.penna@kararamining.com.au

 

Main Report 

Executive Summary (PDF 1.85 MB)
Chapter 1 – Introduction (PDF 3.4MB)
Chapter 2 - Project Description (PDF 9.4 MB)
Chapter 3 - Project Rationale and Alternatives (PDF 171 KB)
Chapter 5 - Stakeholder Consultation (PDF 120 KB)
                   - Description of Existing Environment - part 2 (PDF 5.8 MB)
Chapter 8 - Environmental Management Framework (PDF 529 KB)
Chapter 10 - Study Team   (PDF 128 KB)
Chapter 11 - References (PDF 158 KB)
Chapter 12 - Glossary (PDF 124 KB)